West Utility Plant
(Phase I) Construct an 11,500 GSF utility plant building that will house three 1200 ton chillers and three 9,900 MBH (million British Thermal Units / hour) boilers and connect to existing underground distribution networks. The plant will be sized to accommodate one additional chiller and three boilers for future capacity demand. (Phase II) As the budget allows, chilled water and hot water lines will be piped into the West Campus area so that facilities and future projects may use this plant.
- Project Number: 204 – 18202
- Cost: $30,264,000
- Fund Source: State / W&M debt
- Renovation/additional GSF: 12,650
- Start Date: Nov 2015
- Finish Date: estimated Jan 2020
- Project Manager: Adam Witkowski
- Design Team: RMF Engineering
- Contractor: DPR Construction