Blow IT Data Center Renovation

Installation of a new HVAC system for computer rack cooling to correct the hot and cold aisle air mixing; installation of redundant power sources - two electrical buses (A&B) for scalability and ease of maintenance: and, for uninterruptible power supply, two new UPSs were installed and backed up by a new generator power source. The generator is sized to handle the loads currently on the existing generator. 

  • Project Number: 204-18112-003 -- DEB PC# 204-A9204-005
  • Cost: $2,710,000
  • Fund Source: Debt (0815)                
  • Renovation/additional GSF: 56, 000
  • Start Date: Mar 2017
  • Construction Start Date: July 2021
  • Finish Date: Dec 2022
  • Project Manager: Adam Witkowski
  • Design Team: Clark Nexsen
  • Contractor: Facility Support, Inc.